Fig.15 (taken 5.5 months post-banding; 1.5 months post installation of .016x.016 stainless steel wires and closed springs between U3 and 6): U3 needs to be further distalized (small arrow). Our next main job is to mesialize U5 (large arrow).
Return to Extraction Ortho
Xin Wei, DDS, PhD, MS 1st edition 04/05/2014, last revision 04/05/2014