Fig.3 (the first set of wax up; buccal view): Two implants are to be placed at the sites of the first molars (#3,30). The tooth #28 is an implant-supported crown. Once the implant at the site of #30 osteointegrates, brackcts/bands are placed in the lower arch first. The tooth #29 is intruded using #28,30 implants as anchorages.
When the occlusal interference is removed (supraeruption of the tooth #29), the teeth #4-6 are to be moved distally using #3 implant as an anchorage to establish normal posterior interdigitation. Finally the cross bite of the tooth #7 is corrected.
Return to Implant Assisted Ortho
Xin Wei, DDS, PhD, MS 1st edition 03/20/2013, last revision 03/20/2014