Remove guide after the last drill to check perforation. The depth of it is 7.3+1.2-4=4.5 mm, whereas the bone height is 5.25-5.33 mm.  Measure the length of the last drill and choose 1 mm longer sinus drill.  The water lift.  Then 2 mm longer sinus drill and probe.

Shorty Last Next

Xin Wei, DDS, PhD, MS 1st edition 10/03/2019, last revision 11/06/2019